Welcome to Wentworth, New Hampshire banner

Wentworth Village Bridge

Information About the Bridge

Google Maps directions to the bridge

Photo and brief history of the bridge taken from the 2013 Annual Report

Download the pages This document requires Adobe Acrobat 198 KB

Minutes

Contact Information

  • Office of the Select Board
  • Village Bridge Steering Committee
    • John Meade, Chairman ()
    • Leslie Backstrom
    • Kay Thompson Bailey
    • Max Corbett
    • Susan Corbett
    • Steve Davis,
      Non-voting Wentworth Select Board liaison
    • Donna King
    • Palmer Koelb
    • Peter Kozak
    • Jennifer Meade
    • Ellie Murray
    • Francis Muzzey
Correspondence and Press Coverage
Date Description Link
February 16, 2016 Memorandum of Agreement signed by the Select Board.

November 6, 2015

Letter from David L. Scott, In-House Design Chief, Bureau of Bridge Design, regarding a Memorandum of Agreement regarding the bridge.

This letter was presented to the Select Board but not was not agreed to or signed by the Select Board.

Download the letter and MOA
This document requires Adobe Acrobat 1.8 MB

August 24, 2015

E-mail from David Scott, Project Manager of the Village Bridge project, regarding the current status of the project.

Download the e-mail
This document requires Adobe Acrobat 443 KB

March 17, 2015

WMUR coverage of preserving the pedestrian bridge from the Wayfarer Hotel and Convention Center to replace the Wentworth Village bridge.

Link to WMUR's coverage

November 24, 2014

Questionnaire from Christine Perron, Senior Environmental Manager, NHDOT to the Wentworth Select Board regarding the potential impact of the project on "environmental, social, economic, or cultural resources" (questionnaire).

Download the questionnaire
This document requires Adobe Acrobat 1.3 MB

November 24, 2014

E-mail from Mark Richardson, NHDOT, to the Wentworth Select Board about the status of the bridge efforts and to address public safety concerns.

Download the e-mail
This document requires Adobe Acrobat 85 KB

October 28, 2014

E-mail from Mark Richardson, NHDOT, to the Wentworth Select Board about the current condition of the bridge.

Download the e-mail
This document requires Adobe Acrobat 104 KB

October 10, 2014

NHDOT Condition and Rating of NH Br. No. 148/121 Bypassed/Historic over Baker River In the Town of Wentworth, NH report

Download the report
This document requires Adobe Acrobat 64 MB

February 21, 2014

NHDOT and Wentworth Select Board meeting minutes.

Download the minutes
This document requires Adobe Acrobat 33 KB

December 13, 2013

E-mail regarding the Wentworth Common Bridge from Mark Richardson, Administrator, Bridge Design Bureau, NH Department of Transportation.

Download a copy of the e-mail
This document requires Adobe Acrobat 103 KB